Karak - Ablah-Rayak Road

Bekaa

The project consists of the reconstruction & rehabilitation of approximately 6km of road works. The proposed carriage way crossed three main intersections, and divided into two parts :

  1. The first part begins from Zahle-Karak intersection and ends at Ablah Beit Chama intersection with a total approximate length of 2.7 km.
  2. The second part starts from Ablah-Beit Chama intersection and ends at Rayak intersection with a total approximate length of 3.3 km. It has a bridge structure on Litani river crossing at P.K 5+690.

Role : Main Contractor

Project details

  • Project Category
    RoadsRoads & Infrastructures
  • Location

    Bekaa

  • Status

    Current

  • Responsible

    Council for Development and Reconstruction

  • Consultant

    Dar El Handasah - Nazih Taleb

  • Description

    The project consists of the reconstruction & rehabilitation of approximately 6km of road works. The proposed carriage way crossed three main intersections, and divided into two parts :

    1. The first part begins from Zahle-Karak intersection and ends at Ablah Beit Chama intersection with a total approximate length of 2.7 km.
    2. The second part starts from Ablah-Beit Chama intersection and ends at Rayak intersection with a total approximate length of 3.3 km. It has a bridge structure on Litani river crossing at P.K 5+690.

    Role : Main Contractor